375 Britannia W (Mississauga)
We worked with the Jesselin group alongside multiple trades. We Removed 2 loading docks, dock bumpers, dock seals, and existing overhead doors. After removal, Jesselin team of trades removed the existing precast panel in-between door openings and poured a concrete ramp. After completing we installed a new 16’x14’ steel insulated door with a jackshaft operator, complete with photo eyes.