398 Chrysler (Brampton)
We Removed 3 existing wood flush and re installed 3 new steel insulated doors with new hardware. After installing new doors, we completed pit construction and removed 3 existing pour in pan dock levellers. After removing the docks, we reinstalled 60k capacity hydraulic dock levellers, complete with signage and wheel chalks for optimal shipping and receiving.